这是描述信息

Chinese

这是描述信息

English

搜索
Search
1 1
2 2
3 3
/
/
/
Chief Engineer positions on standards and assessment management practices

Chief Engineer positions on standards and assessment management practices

  • Categories:Announcement
  • Author:
  • Origin:
  • Time of issue:2010-10-15 00:00
  • Views:

(Summary description)

Chief Engineer positions on standards and assessment management practices

(Summary description)

  • Categories:Announcement
  • Author:
  • Origin:
  • Time of issue:2010-10-15 00:00
  • Views:
Information

(First Amendment 4 December 2009)

Chapter I General Provisions

  According to the company the first operation and management, in order for the creation of new engineering and technical backbone personnel working platform, the company set up chief engineer positions, in order to better play to their enthusiasm for work, for the company's development and make greater contributions.

 
Article chief engineer jobs added in the business sector.

Chapter II Post Standard

  Article comply with national guidelines, policies and decrees, earnestly implement the company's rules and regulations.

 
Article systematically master the basic theory and professional knowledge, with some design and project management capabilities to solve complex technical problems on-site.
 
Article master the relevant laws and regulations, technical standards, procedures and specifications.
 
Article VI is responsible for the project belongs to the regulations, the implementation of project plans, organizational acceptance engineering quality; for business and technical documents management and archiving accommodating.
 
Article master science and technology developments, serious promotion of new technologies; optimizing device configuration unreasonable, improve design and construction of the missing presence stuffing; active patents, technical innovation.
 
Article VIII declared the chief engineer must meet the following prerequisites:

  (I). as an engineer duties for more than one year;

 
  (Ii). independently or hosted (as project leader) completed a number of major projects or subprojects key projects this professional;
 
 (Iii). above the provincial level publication published two more than the first author papers; or the first author of a paper published in the second author published two more papers; or obtain a patent, or to obtain new patents for more than two By.

  Article IX chaired or served as a professional person in charge of the project, no direct responsibility for the accident records.

 
  Article X care company, to obey the leadership, with a strong sense of professionalism and sense of responsibility, dedication, work engagement; good at learning, sum, and continuously improve, work do not make repeated mistakes.
 
  Article XI attention to efficiency, not buck, not passing, the courage to take responsibility; work principles, careful and meticulous work, not sloppy, not perfunctory.
 
  Article XII of integrity, honesty, humility rigorous; cardinal, the overall situation, with team spirit, full of team spirit; to properly handle interpersonal relationships, with some public relations capacity.

Chapter III nuclear test

  Article XIII assessment team from the company was founded, every year in September, the company organized the Evaluation and chief engineer. For those who have served as chief engineer positions, once every three years evaluation, examination results as "excellent", "good", "qualified" and "unqualified" four grades. "Unqualified" who terminate the employment office.

 
  Article XIV of the chief engineer in the assessment period must have presided over the completion of the project or independent or served as an independent professional person in charge.
 
  Article XV tenure occurred during a major accident, causing significant economic losses, immediately terminate the employment office.
 
  Article XVI promoted the company's new business unit level cadres, priority hiring engineers from the director.

Chapter IV Shen newspaper

  Article XVII by his application, democratic appraisal department, after the director of the recommendation, fill out the "chief engineer review form", reported the Integrated Management Department, reviewed by the company after the review panel, reported company president office meeting decided to form.

 
   Article XVIII first assessment of the performance of the chief engineer, the last six years in order to prevail.

Chapter V Other

   Article XIX of the "management approach", after the company president's office through implementation.

 
   Article XX of the "management approach", by the comprehensive management unit responsible for the interpretation.

News

08-24

The Successful commissioning of prereduction ferrochromium pellet plant of Hebei Taiheng special steel Co., Ltd

On 16th June 2017, Hebei Taiheng special steel Co., Ltd has successfully completed the hot plant commissioning of No.1 prereduction ferrochromium pellet production line.
11-18

The company successfully identified a provincial-level enterprise technical centers

The company has long insisted focus on the development of cutting-edge technology metallurgical industry, metallurgical industry around energy saving, emission reduction and restructuring varieties overall objective, bold introduction, absorption, digestion of foreign advanced technology, to choose the field of development of the company and carry out follow-up study, technical reserves work, and consolidate the existing technology and improvement, continuous innovation, take advantage of key technologies and core equipment. The company is a newly identified in 2011, high-tech enterprises in Jiangsu Province in 2014 through the review.
11-17

Jilin, Jiangsu Province Chamber of Commerce, Chamber of small and micro enterprises in Jilin City line to the company visit

November 16, 2015, Jilin, Jiangsu Province Chamber of Commerce, president of the Chamber of Commerce Du Jingli small and micro enterprises in Jilin City and his entourage to visit the company, by the group chairman, party secretary, president Luxianzhong hospitality and
上一页
1
2
...
42

©Copyright 2017, MicroPort Scientific Corporation. All rights reserved.

Telephone:025-51198899 FAX:025-51198616 mail:zengwei@mountop.com.cn

Website registration / license number: 苏ICP备08012245号-1 Powered By www.300.cn  nanjing Address: No. 368 East Tianyuan Road, Jiangning District, Nanjing